Back to the top
Live Cinema Festival 2014

Live Cinema Festival 2014

  • 110462 Views
  • Likes

September 17 - 20 2014, Rome

Teatro Quarticciolo, Roma, Italy

  • Wednesday, 17 September 2014 | Teatro Quarticciolo, Teatro Quarticciolo, Roma, Italy
  • September 18 // 20 2014 | Teatro Quarticciolo, Roma, Italy

Festival

SuperEverything*

  • 4680 Views
  • Likes
SuperEverything*
Super Everything* is a piece of audio-visual performance art that explores the cultural landscape of Malaysia through the relationship between identity, ritual and place.
It’s a tapestry of stories and converging themes that aims to transcend cultural boundaries and to provoke its audiences to re-examine a range of subjects that effect us all.

It is a project that attempts to survey our collective search for meaning, from our fascination with identity to the urbanisation of the landscape to our cathedrals to consumer culture, in order to ask fundamental questions about our human condition in the twenty first century.

APPROVED BY
British Council
http://www.britishcouncil.it

Duration (minutes)

55

What is needed

LIGHT SURGEONS WILL SUPPLY
FESTIVAL WILL SUPPLY
Stage Build - (to be discussed in relation to venue spec)
2 x Steel Deck Table (2m L x 1m D x 75Cm H approx) 1 x Steel Deck Riser (2m L x 1m D x 25Cm H approx) 1 x Front Projection Screen – 9m x 3.375m
1 x Gauze projection Screen – 9m x 6m
Suitable rigging for both screens – 10m fly bars ideal
2 x 9m conduit/steal pipe to weigh the screen down
4 x Blackout Legs, 2 x headers (this is to crop and dress screens if necessary)
Lighting - (to be discussed in relation to venue spec)
10 x Chauvet Q Wash Moving head LED spot 6 x Visage (Batmink) LED Multipar 375 Pro
4 x 650W Fresnels (shadow play)
4 x Fresnel Floor stands
6 x Source4 Jr zoom profile (artist spotlights) 6 x Source4 floor stands
Blue, Red, Green HT Gel colour filters Suitable lighting desk
PA System
Fully time aligned three way active system to evenly and adequately cover entire audience area. Any fills necessary in addition to the main PA must have separate level, EQ and delay controls. Subs not to be under stage. Ground stacked PAs must be above head height. Full access to all system processing. Full PA spec to be submitted in advance. D&B / Meyer / Martin preferred.
This is a quadraphonic show, we require 2 full-range rear-fills fed from 2 auxiliary outputs from the FOH desk
Microphones and Stands
3 x Tall Boom Stands
1 x Tall Straight stand 6 x Short Boom Stands 10 x Active DIs
1 x beta 58
4 x KM 184
2 x C414
Monitors
4 x high quality monitors on 3 x mixes - d&b M4s / L’Acoustics 115XTs preferred
Video
1 x Panasonic DZ110 Full HD Projector + 1 x ET-D75LE5 0.7:1 lens (Equivalent lens and full HD projector subject to availability and in relation to the venue specs)
1 x Panasonic DZ770 + 1 x ET-DLE080 0.8-1.0:1 lens and hanging cradle (Equivalent lens and full HD projector subject to availability and in relation to the venue specs)
(1 SDI input to 2 outputs for above monitors)
1 x SONY EX1 HD Video Camera (Used for documentation & camera feed for stage) 1 x 16gig SXS Card
1 x 8gig SXS Card
1 long SDI cable run to FOH position (length in relation to venue specs)

POWER AND 13amp DISTRO – SEE STAGE PLAN Assorted Video, Audio & Light cables for all of the above
TLS On Stage setup
1 x Pioneer DJM800 DJ mixer with midi output
2 x 16:9 Preview LCD monitors (22” with HMDI input) 1 x SDI to HDMI convertor
1 x Signal Splitter / Video DA
3 x Apple Laptop (Running VD-MX / ABLETON LIVE) 2 x Ipad
1 x External Hard Drive
3 x Midi Controllers
1 x 4 channel Network Router (with internet access) Assorted patch cabling for the above
Chor Guan Ng On Stage setup
1 x Apple Laptop
1 x 3-4 octave midi Keyboard
2 x Glass mixing bowls (these should be slightly different size eg http://johnlewis.scene7.com/is/image/JohnLewis/000012450alt1?$prod_lrg$)
1 x Chopping board, chef's knife and assorted fresh veg (Pak Choi, cabbage, etc)
Documentation
1 x CANON 7D + Tripod (for FOH documentation)
1 x ZOOM Sound Recorder (for FOH documentation)
TECHICIAL CREW
We will need a minimum of:
1 x AUDIO
1 x VIDEO
1 x LIGHTING
PLEASE LET US KNOW ASAP IF ANY OF THE ABOVE EQUIPMENT CANNOT BE SOURCED LOCALLY.
If required, equipment can be sourced and hired but:
EQUIPMENT HIRE COSTS ARE TO BE PAID ON TOP OF THE ARTIST FEE
NOTE:
FESTIVAL SHOULD PROVIDE A DRESSING ROOM, COLD DRINKS, OTHER SUITABLE FOOD FOR THE PERFORMERS ON THE DAY OF THE PERFORMANCE.
Please, take into consideration the following:
We will require approximately 4 hours to set up this show. We will require a Rehearsal time of 2-3 hours.

  • AV Performance
The Light Surgeons
The Light Surgeons

United Kingdom London

Events

Live Cinema Festival 2014
Live Cinema Festival 2014
Wednesday, 17 September 2014